Metro Fare (Mauritius)

Metro Fare (Mauritius)

Ryckesh 01/27/2023
5.2
10K
No resources yet
SENGFT
You need SENGFT to install .XAPK File.
  • Screenshot1
  • Screenshot2

Description

NEW LIGHT RAIL TRANSPORTATION TECHNOLOGY IN MAURITIUS

The island of Mauritius, slightly larger than Greater London, lies some 2000 km east of the African continent (900 km east of Madagascar) in the Indian Ocean (pop. 1.3 million).

Construction on a 26 km light rail line from the capital Port-Louis (150,000 inh.) via Rose Hill to Curepipe started in 2017, to open in stages by 2021.

- 19 stations: 17 at-grade and two elevated

- 18 low-floor Urbos 100 trams provided by CAF (45.4 m long, 2.65 m wide)

10 Jan 2020: Port Louis Victoria – Rose Hill (12.6 km) in commercial service as of after several months of testing with selected passengers; with an extension to Aapravasi Ghat still pending

20 June 2021: Rose Hill – Quatre Bornes (2.6 km)
08 May 2022: Quatre Bornes – Phoenix (3.6 km)
10 Oct 2022: Phoenix – Curepipe Central (6.9 km)

Get routes' fare and navigation guidance so to adapt with this new light rail technology.

What's New in the Latest Version  1.1

Metro Fare Mauritius v1.1

Information
  • Version
  • Update
  • File size
  • Category
  • Requires Android
    Android 6.0 and up
  • Developer
    Ryckesh
  • Installs
    10K
  • ID
    com.MadeInMaurice.MetroFare
  • Available on
Related Tags
You May Also Like